本论文主要是以山西晋煤集团寺河矿3302综采工作面为研究对象,对其供电系统的方案进行了全面的设计分析,并就负荷统计、变电站容量、井下电缆及低压电器设备选择等方面进行了分析研究。
This thesis mainly takes 3302 fully mechanized coal face in Sihe Coal Mine in Shanxi Jincheng Coal Group as the research object, designs the scheme of the power supply system and analyzes it in terms of the statistics, transformer substation and the load capacity and underground cables and low voltage electrical equipment selection, etc.
作者
李康
Li Kang(Sihe Coal Mine, Shanxi Jincheng Anthracite Mining group Co., LTD., Shanxi Jincheng 04800)
出处
《山东煤炭科技》
2018年第5期145-147,共3页
Shandong Coal Science and Technology
关键词
综采工作面
供电系统
变电站容量
负荷
fully mechanized working face power supply system substation capacity load