摘要
工程建设的甲供物资采用最低投标价法采购,虽然能有限降低采购成本、控制工程造价、减少人为干预因素。但在评标过程中也存在难以判定其投标报价是否低于成本价、明显高于市场价等方面的问题,为此进行分析和探讨,通过分析探讨,提出应对措施。并以某工程物资招标采购实例,验证了所提应对措施的可行性。
The procurement of client - supplied good and materials for railway construction adopts the lowest bidding price method. This bidding method can reduce procurement cost, control project cost and reduce human intervention factors. But there are also some problems in the process of bid evaluation need to be ana- lyzed, such as difficult to determine whether the tender price is lower than the cost price or the market price. Through the analysis and discussion, the countermeasures are put forward. And the feasibility of proposed measures is verified by an example of bidding procurement of client - supplied good and materi- als for railway.
出处
《铁路工程技术与经济》
2018年第3期39-42,共4页
Railway Engineering Technology and Economy
关键词
铁路建设
甲供物资
最低投标价法采购
问题分析
应对措施
Railway construction
Client - supplied good and materials
Lowest bidding price method
Problem analysis
Countermeasures