铁路建设甲供物资采用最低投标价法采购存在问题的分析及应对措施 被引量:2

Analysis and Countermeasures for the Problems of Procurement of Client-supplied Good and Materials for Railway Construction by the Lowest Bidding Price Method
下载PDF
导出
摘要 工程建设的甲供物资采用最低投标价法采购,虽然能有限降低采购成本、控制工程造价、减少人为干预因素。但在评标过程中也存在难以判定其投标报价是否低于成本价、明显高于市场价等方面的问题,为此进行分析和探讨,通过分析探讨,提出应对措施。并以某工程物资招标采购实例,验证了所提应对措施的可行性。 The procurement of client - supplied good and materials for railway construction adopts the lowest bidding price method. This bidding method can reduce procurement cost, control project cost and reduce human intervention factors. But there are also some problems in the process of bid evaluation need to be ana- lyzed, such as difficult to determine whether the tender price is lower than the cost price or the market price. Through the analysis and discussion, the countermeasures are put forward. And the feasibility of proposed measures is verified by an example of bidding procurement of client - supplied good and materi- als for railway.
作者 兰剑
出处 《铁路工程技术与经济》 2018年第3期39-42,共4页 Railway Engineering Technology and Economy
关键词 铁路建设 甲供物资 最低投标价法采购 问题分析 应对措施 Railway construction Client - supplied good and materials Lowest bidding price method Problem analysis Countermeasures
  • 相关文献

参考文献1

二级参考文献4

共引文献1

同被引文献7

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部