摘要 在混合梁斜拉桥钢混结合段施工过程中,钢梁与混凝土梁的连接是整个工程项目的重点施工内容。鉴于此,论文以石首长江公路大桥工程中的主桥钢混结合段施工项目为例,进行了一系列的研究和分析,旨在提升混合梁斜拉桥工程的施工质量。 The connection between steel beam and concrete beam is the key construction content of the whole project during the construction of the steel concrete composite section of the hybrid girder cable-stayed bridge. This paper takes the construction project of the main bridge of the Yangtze River highway bridge in Shishou as an example to carry out a series of research and analysis, in order to improve the construction quality of hybrid girder cable-stayed bridge.
作者 宋书玉 SONG Shu-yu(China Railway Construction Bridge Engineering Bureau Group No.1 Engineering Co. Ltd., Dalian 116083, China)
出处 《工程建设与设计》 2018年第10期208-209,共2页 Construction & Design for Engineering
关键词 桥梁工程 钢混结合段 施工 bridge engineering steel-concrete composite segment construction
  • 相关文献

参考文献2

二级参考文献15

共引文献41

同被引文献46

引证文献7

二级引证文献47

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部