摘要
在混合梁斜拉桥钢混结合段施工过程中,钢梁与混凝土梁的连接是整个工程项目的重点施工内容。鉴于此,论文以石首长江公路大桥工程中的主桥钢混结合段施工项目为例,进行了一系列的研究和分析,旨在提升混合梁斜拉桥工程的施工质量。
The connection between steel beam and concrete beam is the key construction content of the whole project during the construction of the steel concrete composite section of the hybrid girder cable-stayed bridge. This paper takes the construction project of the main bridge of the Yangtze River highway bridge in Shishou as an example to carry out a series of research and analysis, in order to improve the construction quality of hybrid girder cable-stayed bridge.
作者
宋书玉
SONG Shu-yu(China Railway Construction Bridge Engineering Bureau Group No.1 Engineering Co. Ltd., Dalian 116083, China)
出处
《工程建设与设计》
2018年第10期208-209,共2页
Construction & Design for Engineering
关键词
桥梁工程
钢混结合段
施工
bridge engineering
steel-concrete composite segment
construction