摘要 研究了双塔双索面大跨度斜拉桥稳定性.针对赣江二桥双塔双索面结合梁斜拉桥,考虑结构几何非线性及材料非线性,采用包含梁和索单元的空间组合结构模型,分析了大桥的结构行为,研究了斜拉桥在成桥阶段结构的第一类和第二类稳定性问题.利用ANSYS建立了赣江二桥成桥阶段的整体稳定性分析模型,求解了4种不同工况(恒载+全桥满布活载、恒载+全桥半跨布活载、恒载+中跨布活载以及恒载+全桥满布活载+风荷载)的弹性屈曲系数和第二类稳定的极限承载力.结果表明:赣江二桥成桥阶段的整体稳定性满足要求. GanJiang No.2 Bridge is a double tower double cable plane reinforced concrete composite beam cablestayed bridge.The long-span cable-stayed bridge is a flexible structure system,and its nonlinearity is mainly embodied in geometric nonlinearity and material nonlinearity.Using the finite element software to analyze the structural behavior of the bridge,the geometric nonlinearity of the structure and the nonlinearity of the material were taken into account in the process of analyzing the composite spatial structure model including the beam and cable elements.The stability of the cable-stayed bridge included the first-class stability and the second-class stability.This paper focused on the first-class stability and the second-class stability of the cable-stayed bridge.In this paper,a model for the overall stability analysis of the bridge of the GanJiang No.2 Bridge was established by ANSYS.When studying the stability of the bridge of the GanJiang No.2 Bridge,the loads were considered as follows:structural weight,deck pavement,cable tension,car and crowd load.In the analysis of the load conditions taking into account the four different conditions,namely,full load+full bridge full load live load,full load+full bridge half span fabric live load,dead load+span fabric live load and full load+ Bridge full load live load+ wind load.It can be seen from the analysis that the elastic buckling coefficient and the second kind of stable safety factor of the GanJiang No.2 Bridge in bridge stage meet the requirements in four different working conditions.The results demonstrate that the overall stability of the GanJiang No.2 bridge is satisfactory.In the second type of stability analysis,the second type of stability analysis of the bridge is performed by considering both geometric nonlinearity and double nonlinearity.It can be seen from the analysis that the elastic buckling coefficient under the four different working conditions of the GanJiang No.2 bridge is considered,and the second type of stable safety factor base considering the geometric nonlinearity is considered.Considering the nonlinear second double type stable safety factor meet the requirements of the specification,the results show that the overall stability of the bridging phase inGanJiang No.2 Bridge meets the requirements.
作者 田五胜 梁斌 吴鸿胜 TIAN Wusheng;LIANG Bin;WU Hongsheng(School of Civil Engineering, Henan University of Science and Technology, Henan Luoyang 471003, China;The Fifth Subsidiary of China Railway 15th Construction Bureau Group Corporation, Tianjin 300000, China)
出处 《河南大学学报(自然科学版)》 CAS 2018年第3期371-378,共8页 Journal of Henan University:Natural Science
基金 河南省科技厅产学研合作项目(2015HNCXY011)
关键词 大跨度斜拉桥 双塔双索面 成桥阶段 非线性 稳定性 结构分析 long-span cable-stayed bridge double-span and double-cable bridging stage nonlinearity stability structural analysis
  • 相关文献

参考文献12

二级参考文献103

共引文献88

同被引文献42

引证文献6

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部