摘要 以崇左市崇左大桥为研究对象,在主梁0号块的施工过程中,通过对墩塔梁固结结构体系的分析和研究,采用预留后浇带湿接缝,横、竖向分块分次浇筑混凝土的施工方法,大幅降低了混凝土现浇箱梁的横向收缩带来的不利影响,保证了工程施工质量,对类似工程有一定的参考借鉴价值。 Taking the Chongzuo Bridge as the research object, during the construction of main girder No. 0 block, the pier tower girder fixed structure system was analyzed. The construction methods were adopted by reserving post-pouring belt as a wet joint, pouring concrete within each block and phase in transverse and vertical directions, which greatly reduced the negative effect caused by transverse shrinkage of cast-in-place concrete box girder, and ensured the quality of engineering construction. It could provide certain reference value for similar projects.
作者 杨维威 Yang Weiwei(China Railway 19th Bureau Group Co. Ltd. , Beijing 100176, China)
出处 《铁道建筑技术》 2018年第5期41-43,54,共4页 Railway Construction Technology
基金 中铁十九局集团有限公司科技研究开发计划项目(17-5A)
关键词 大吨位 墩塔梁固结结构体系 箱梁 0号块 large tonnage consolidation structure system of pier tower beam box girder No. 0 block
  • 相关文献

二级参考文献27

共引文献31

同被引文献36

引证文献5

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部