盾构施工中管片缺陷的防治与成型后缺陷处理措施研究 被引量:11

Research on Preventing Segment Defects in Shield Tunnelling and Treatment Measures for the Formed Segment Defects
下载PDF
导出
摘要 地铁盾构隧道质量是大家关注的问题,而盾构隧道质量问题大多出现在管片上,当成型隧道出现管片上浮、错台、破损、裂纹等问题时,不仅要防水堵漏,还得采用一定的控制措施来解决隧道成型管片质量问题。本文措施能解决隧道在推进及拼装过程中发生错台、破损、裂纹后进行防治、控制的问题,也能解决管片成型后出现的缺陷等问题,确保了成型隧道满足运营安全要求。 The quality of metro shield tunnel is a matter of concern, however, the quality problems of shield tunnel are mostly on the segment. Once some issues arise with the formed tunnel, such as segment floating, faulting of slab ends, breakage and cracks, the control measures, including waterproofing and plugging, should be taken to solve the quality problems of the formed segment. In this paper, the measures can solve not only the above problems during tunnel' s driving and assembling, but also the defects after segment being formed. It could ensure the finished tunnel meet the operation safety requirements.
作者 迟家凤 Chi Jiafeng(China Railway 19th Bureau Group Rail Transit Engineering Co. Ltd. , Beijing 101300, China)
出处 《铁道建筑技术》 2018年第5期74-76,122,共4页 Railway Construction Technology
基金 中铁十九局集团有限公司科技研究开发计划项目(17-12B)
关键词 盾构隧道 管片上浮 错台 破损 裂纹 shield tunnel segment floating faulting of slab ends damage fissure
  • 相关文献

参考文献8

二级参考文献42

共引文献109

同被引文献75

引证文献11

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部