摘要
结合开封市一渠六河项目D800污水顶管施工,介绍了顶管施工的整个过程,特别是详细地对顶力和后座墙土体进行了受力计算,便于保证工作坑的安全,防止后座墙土体破坏,为顶管工程施工提供了参考。
Combined with the D800 sewage pipe jacking construction of Yiqu-Liuhe Project in Kaifeng, this paper introduced the whole process of pipe jacking construction, especially with the detailed stress calculation of the jacking force and back- wall soil, so as to ensure the safety of working pit and prevent the destruction of the back-wall. It could provide a reference for the construction of pipe jacking engineering.
作者
杨友超
Yang Youchao(China Railway 20thBureau Group Municipal Engineering Co. Ltd. , Lanzhou Gansu 730046, Chin)
出处
《铁道建筑技术》
2018年第5期107-110,共4页
Railway Construction Technology
基金
中铁二十局集团有限公司科技研发项目(J17-31C)
关键词
顶管
后座墙
受力计算
pipe jacking
back-wall
force calculation