摘要
通过对中铁二十局集团BLIDA5000套项目应用隧道模板进行建筑主体施工工艺的总结分析,集中讨论了隧道模板在施工原理、施工顺序、材料使用、设备配置、人工使用及其他施工要点方面的优劣,并从安全、进度、质量、效益等各个方面进行探讨,进一步提炼出成熟经验,以证明隧道模板体系在阿尔及利亚房建项目中应用的可行性。
Through summarizing and analyzing the construction technology of tunnel formwork applied in the major building structure in the BLIDAS000 project by China Railway 20th Bureau Group, the author mainly discussed the advantages and disadvantages of the tunnel formwork in construction principle, construction sequence, material usage, equipment configuration, manual use and other construction points, and made an exploration in various aspects of safety, progress, quality and benefits, and further refined the mature experiences to prove the feasibility of tunnel formwork system applied in the construction project in Algeria.
作者
王永岗
Wang Yonggang(China Railway 20^th Bureau Group 6^th Engineering Co. Ltd. , Xi'an Shaanxi 710032, China)
出处
《铁道建筑技术》
2018年第5期116-118,共3页
Railway Construction Technology
基金
中铁二十局集团有限公司科技研发项目(YF1506FJ01B)
关键词
房建
标准层
隧道模板
效益
housing
standard floor
tunnel formwork
benefit