摘要
结合实际工作中大量铁路货车超偏载检测装置需要进行大修的情况,介绍超偏载检测装置大修方案的选取、施工组织实施和设备调试等方面内容以及关键技术要点,并对超偏载检测装置大修的优化提出建议。
In combination of practical work,with a view that a great quantity of freight wagon overloading unbal-anced loading detecting devices need an overhaul,the Article introduces the selection of the overhaul scheme foroverloading unbalanced loading detecting devices,the organization and implementation of the construction,theequipment debugging and other aspects,as well as the key technical points.It gives some suggestions for optimiz-ing the overhaul of overloading unbalanced loading detecting devices.