期刊文献+

梅山连拱坝右岸13号拱渗流量增大效应分析 被引量:3

Influence Analysis of Seepage Quantity Increasing of Arch #13 on Right Bank of Meishan Multi-arch Dam
下载PDF
导出
摘要 针对2013年前后梅山连拱坝右岸13号拱的坝基渗流量增大现象,开展其与库水位、扬压力折减系数和大坝变形关系的时空分析,表明这很可能是水库增蓄和库水绕渗联合作用的效果,目前右岸坝基工作性态总体正常.利用置信区间法拟定典型测孔渗流量监控指标,结合坝基地质特点,提出右岸坝基渗流隐患的跟踪监控建议. Based on the phenomenon of seepage quantity increasing of arch #13 on the right bank of Meishan Multi-arch Dam foundation around 2013,spatiotemporal analysis is carried out on its relationship with reservoir water level,uplift pressure reduction coefficient and dam deformation.This may be the combined effect of increasing water infiltration and the around dam seepage.The confidence interval method is used to determine the seepage quantity monitoring index of the typical seepage observation holes.Combined with the geologic characteristics of the dam foundation,the proposal for tracking and monitoring the hidden danger of seepage at the dam foundation on the right bank is offered.
作者 陈波 何明明 何启 卢万友 赵庆国 Chen Bo;He Mingming;He Qi;Lu Wanyou;Zhao Qingguo(State Key Laboratory of Hydrology-Water Resources & Hydraulic Engineering, Hohai Univ., Nanjing 210098, China;National Engineering Research Center of Water Resources Efficient Utilization & Engineering Safety, Hohai Univ., Nanjing 210098, China;College of Water Conservancy & Hydropower Engineering, Hohai Univ., Nanjing 210098, China;Management Office of Meishan Reservoir, Jinzhai 237300, China)
出处 《三峡大学学报(自然科学版)》 CAS 北大核心 2018年第4期6-9,共4页 Journal of China Three Gorges University:Natural Sciences
基金 国家自然科学基金(51609074 51739003) 江苏省基础研究计划(BK20160872) 国家重点研发计划(2016YFC0401601) 中央高校基本科研业务费项目(2017B11114)
关键词 梅山连拱坝 渗流量 安全监控指标 Meishan Multi-arch Dam seepage quantity safety-monitoring index
  • 相关文献

参考文献6

二级参考文献7

共引文献2

同被引文献13

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部