摘要
根据孟加拉国巴拉普利亚煤矿1210工作面的实测资料,利用UDEC数值模拟软件,单层开采5 m情况时,模拟计算首分层~六分层开采后覆岩最大导水裂缝带的高度;单层开采10 m情况时,模拟计算首分层~三分层开采后覆岩最大导水裂缝带的高度。通过与经验公式计算结果进行分析对比,给出了硬顶板条件下分层开采导水裂缝带高度发育的计算公式。
According to the measured data of the face UDEC numerical simulation software is used to study 1210 of Balapulia coal mine in Bangladesh, the the maximum height of the diversion tunnel, in the case of the single layer mining 5 m and 10 m. Based on the analysis and comparison of the empirical formula, the calculation formula of the height development of the aqueduct in the sub - bed under the condition of hard roof is given.
作者
王钰
谭志祥
魏飞
邓喀中
冯军
WANG Yu1,2, TAN Zhi-xiang1,2, WEI Fei1,2, DENG Ka-zhong1,2, FENG Jun3(1. School of Environment and Survey and Mapping, China University of Mining and Technology, Xuzhou 221116, China; 2. Jiangsu Key Laboratory of Resource and Environmental Information Engineering, China University of Mining and Technology, Xuzhou 221116, China; 3. Shanxi Coal Geological Survey Institute 115, Datong 037000, Chin)
出处
《煤炭技术》
CAS
2018年第6期171-173,共3页
Coal Technology
基金
国家自然科学基金资助项目(41272389)
江苏高校优势学科建设工程资助项目(SZBF2011-6-B35)
关键词
巨厚煤层
分层开采
覆岩破坏
导水裂缝带发育高度
数值模拟
thick coal seam
layered mining
overburden damage
development height of permeablefracture zone
numerical simulation