摘要
通过回顾北川地震遗址博物馆策划与整体方案设计项目的起因与过程,以及对项目的定位与主要内容的概述,文章着重分析了项目的价值,包括对灾区当地民众产生的深刻影响,以及为后续北川老县城地震遗址地区整体灾后重建与具体项目建设所起到的基础性作用,并总结归纳出有力的组织保障、积极的参与动因和务实的工作策略是助推整个项目成功的关键。
This article reviews the origin and process of the planning and overall schematic design of the Beichuan Earthquake Ruins Museum, and gives an overview of the project's position and its main content. It analyzes the significance of the project, including the profound impact on local residents in the disaster area, and the positive role it has played in the overall subsequent post-disaster reconstructions and specific projects in the earthquake ruins of old Beichuan County and the surrounding areas. Finally it concludes that strong support to the organization, active motivation of participation and practical strategy are the key factors contributing to the success of the whole project.
作者
吴长福
张尚武
汤朔宁
谢振宇
WU Changfu;ZHANG Shangwu;TANG Shuoning;XIE Zhenyu
出处
《时代建筑》
2018年第3期121-127,共7页
Time + Architecture
关键词
地震遗址博物馆
策划
整体方案设计
责任心
专业性
Earthquake Ruins Museum
Plan
Overall Schematic Design
Responsibility
Professionality