期刊文献+

公众参与工程公共风险治理的效度与限度 被引量:2

The Validity and Limit of Public Participation in the Governance of Public Risks of Engineering
原文传递
导出
摘要 工程公共风险是指工程给公众、社会和自然带来的风险。公众是工程提供的产品或服务的消费者,是承担危险后果的主体,因此公众参与应成为工程公共风险治理结构中的关键组成部分。面对公众参与工程公共风险治理的诸多困境,应从普通公众、工程开发者、政府等多个主体的立场上,从过程和结果两个维度综合考量公众参与的效度。同时,公众参与工程公共风险的治理是有限度的,要避免参与不足,防止参与过度,保持在一个合理的区间。有效的公众参与需要长期的积累,既需要制度的约束加以保障,又需要文化的积淀来孕育。 Public risks of engineering refer to the risks brought by engineering projects to the public, society and nature. The public are the consumers of products or services provided by engineering and the main subjects to take the risks consequences. Therefore, public participation should be a key component in the governance structure of public risks of engineering. Undoubtedly, there are some dilemmas for the public to participate in the governance. It is essential to consider synthetically the validity of public participation from the standpoints of multiple subjects such as the general public, the project developer, the government, and from two dimensions of the process and the result. Moreover, there is has a limit for the public to participate in the governance of engineering risks. Public participation should be kept in a reasonable interval, avoiding insufficient participation as well as excessive participation. Hence, effective public participation needs long-term accumulation. It is essential to be guaranteed by systematic regulations and bred by a favorable culture.
作者 王耀东 WANG Yaodong(College of Marxism, Shandong University of Science and Technology, Qingdao, Shandong, 26659)
出处 《自然辩证法通讯》 CSSCI 北大核心 2018年第6期94-99,共6页 Journal of Dialectics of Nature
基金 国家社会科学基金项目"基于公共安全视角的工程风险认知与治理机制研究"(项目批准号:14BZX026) 中国国家留学基金资助
关键词 工程 公共风险 公众参与 效度 限度 Engineering Public risks Public participation Validity limit
  • 相关文献

参考文献1

二级参考文献4

共引文献1

同被引文献59

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部