摘要 宁波梅山春晓大桥工程水中引桥采用3×72 m连续钢桁架叠合梁结构。现结合梅山春晓大桥水中引桥的设计及施工实践,简要介绍连续桁架钢桁梁设计、上层叠合桥面板裂缝控制技术。并结合梅山春晓大桥工程所处的环境特点,介绍其钢桁架主梁采用的建造施工技术。其内容可供类似工程参考。 The 3 ×72 m-span continuous steel truss composite girder structure is adopted in the water approach bridge of the Meishan Chunxiao Bridge in Ningbo. Combined with the design and construction practices of the water approach bridge of Meishan Chunxiao Bridge, this paper briefly introduces the design of continuous truss steel truss girder and the crack control technology of the bridge deck. Also combined with the environmental characteristics at the project of Meishan Chunxiao Bridge, this paper introduces the construction technology of the steel truss beam. The contents can be referred for the similar projects.
作者 卿前志
出处 《城市道桥与防洪》 2018年第6期78-81,共4页 Urban Roads Bridges & Flood Control
关键词 连续钢桁架 叠合梁 裂缝控制 钢主桁施工 continuous steel truss composite beam crack control construction of main steel truss
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部