采用不同长度拉森钢板桩分级分层支护,分块、分层进行土方开挖是平潭金井湾片区环湖路(金井一路东侧段)市政道路主线箱涵和叉道口箱涵深基坑支护与土方开挖的方案,论文结合该工程的特点,介绍了主要的施工工艺和方法。
Larsen steel sheet pile with different length grading layered supporting, block, stratification of earthwork excavation is the bay area lake-ring pingtan gold(gold well all the way east section) of municipal road line box culvert and fork crossing box culvert of deep foundation pit supporting and earthwork excavation scheme. Combined with the characteristics of the project, this paper introduces the main construction technology and method.
作者
苏雄丰
SU Xiong-feng(Fujian Rongjian Group Co.Ltd.,Longyan 364000,Chin)
出处
《工程建设与设计》
2018年第11期202-206,共5页
Construction & Design for Engineering
关键词
深基坑
拉森钢板桩
支护
开挖
方法
deep foundation pit
larsen steel sheet pile
support
excavation
methods