摘要
根据隧道施工特点和风险评估结果,提出并采取了相应的风险控制措施,塌方、大变形风险等级均降至中度及以下,有效提高了施工安全水平,可供参考。
According to the tunnel construction characteristics and risk assessment results, the corresponding risk control measures are proposed and taken. The risk level of large deformation is reduced to moderate or below, which effectively improves the safety level of construction, and provides a reference.
作者
李平
LI Ping(The 7th Engineering Co.Ltd.ofChina Railway 12th Bureau Group,Changsha 410004,China)
出处
《工程建设与设计》
2018年第11期207-209,共3页
Construction & Design for Engineering