摘要
南方某江边取水泵站位于水库下游约1 km,洪水期受水库泄洪影响,泵站部位局部水流流速达5 m/s。高流速冲刷使泵站底部卵石层地基层面不稳定,泵站受水流冲击并可能会产生振动。通过采取"半嵌入型"平面布置方式、钻孔灌注桩与高压旋喷桩结合的地基处理方式、端部半圆形泵站体型等措施,成功解决了各个难点问题。工程经受住了洪水考验,取得了良好的施工和运行效果,可为类似工程设计提供借鉴。
kin. The flood A riverside water pumping station is located at the downstream of the reservoir about 1 discharge from reservoir could cause local flow velocity of pumping station up to 5 m/s. High flow velocity scour made the pebbles at the bottom unstable, and vibration occurred to the pumping station since it was impacted by the water flow. By adopting a "semi embedded" layout pattern, in com- bination of bored pile and high pressure jet pile foundation treatment and shape measure of end semicir- cle, the difficult problems were successfully solved. The pumping station had withstood the test of the flood, and achieved good construction and operation results, which could provide experience for similar project design.
作者
程子悦
渠元闯
李桂海
杨仲韬
CHENG Zi-yue;Qu Yuan-chuang;LI Gui-hai;YANG Zhong-tao(North China Municipal Engineering Design & Research Institute Co. Ltd., Tianjin 300381, China)
出处
《中国给水排水》
CAS
CSCD
北大核心
2018年第12期42-45,共4页
China Water & Wastewater
关键词
高流速区
取水泵站
结构设计
high velocity area
pumping station
structure design