古城煤矿副立井井筒掘砌施工技术 被引量:5

Tunneling construction technology for auxiliary vertical shaft of Gucheng Coal Mine
下载PDF
导出
摘要 为加快古城煤矿副立井井筒掘砌施工,对现场施工装备和工艺进行优化,科学组织,合理布局,在掘砌过程中采用快速施工机械化作业线施工,不断进行技术革新攻克施工过程中的难点。在井筒防治水方面采用注浆为主、"截、导、堵、排"等措施为辅的综合防治水技术。大大的缩短了矿井一期工程的建设周期,为井筒装备创造了良好的条件。 In order to speed up the construction of secondary shaft excavation in the Gucheng Coal Mine,optimize the onsite construction equipment and technology,we scientifically organize and rationally layout,use the rapid construction mechanization line construction in the excavation process,and continuously carry out technical innovation to overcome the difficulties in the construction process. The comprehensive water prevention technology for mine shaft is applied mainly using grouting supplemented by measures such as"cutting,guiding,blocking,and discharging". It has greatly shortened the construction cycle of the mine joint project and created good conditions for shaft equipment.
作者 周公建 林建 陈国栋 杜锋 ZHOU Gong-jian;LIN Jian;CHEN Guo-dong;DU Feng(No. 29 Construction Department of CCMCGC, Suzhou 234000, Chin)
出处 《煤炭工程》 北大核心 2018年第6期59-61,共3页 Coal Engineering
关键词 副立井 井筒掘砌 小型挖掘机 混合作业 防治水 auxiliary vertical shaft shaft sinking small excavator combined operation water prevention
  • 相关文献

参考文献5

二级参考文献17

共引文献16

同被引文献29

引证文献5

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部