煤炭地质工程监理控制核心及要点研究 被引量:3

Control core research and key points analysis of coal geological engineering supervision
下载PDF
导出
摘要 系统分析总结了煤炭地质工程30年监理成果,总结归纳了30年监理工作的有效控制方法。结合煤炭地质工程监理规范,形成了煤炭地质工程监理控制的核心、要点。控制的要点是分类(质量、投资、进度、安全),分层(施工方、监理方、投资方),分级(事前、事中、事后),并提出煤炭地质工程控制的核心是新技术、新工艺的使用。实践结果证明控制方法行之有效。 The author systematically analyzes and summarizes the 30 year supervision results of coal geological engineering,summarizes effective control methods of the supervision work. Combining with coal geological engineering supervision standards,the core and key points of coal geological engineering supervision and control are offered,that is,the main points of control is type-classification(quality, investment, progress, safety), party-classification(construction party,supervisor party,investing party),and stage-classification(before,during,afterwards). And it is proposed that the core of coal geological engineering control is the application of new technologies and new processes. The practical results show that the control method is effective.
作者 张玉峰 ZHANG Yu-feng(Rongda Company, General Prospecting Institute, China National Administration of Coal Geology, Beijing 100039, China)
出处 《煤炭工程》 北大核心 2018年第6期148-150,共3页 Coal Engineering
关键词 煤炭地质 工程监理 质量控制 进度控制 投资控制 事故防控 安全防控 coal geology project supervision quality control schedule control investment control accident prevention and control security control
  • 相关文献

参考文献3

二级参考文献10

共引文献31

同被引文献17

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部