期刊文献+

首山矿井筒揭煤及过强含水层施工监理 被引量:2

Construction supervision for shaft coal uncovering and crossing strong aquifer in Shoushan mine
下载PDF
导出
摘要 为做好矿山的监理工作,文章介绍了兴平工程管理公司采取的在工程初期全局掌控工程,配设专职质检员和坚持"质量一票否决制"的原则,应用信息化管理系统等管理措施。并提前规划创优方案,严格执行创优标准:要求施工单位事前编制创优方案,监理部认真学习创优方案,创优方案的落实。最后介绍了新技术在高瓦斯突出矿井突出煤层的应用,利用原有优秀QC成果和经验通过平顶山砂岩强含水层等工作经验。 In order to improve the supervision of mine construction, the author describes the principles adopted by Xingping Project Management Company in initial stage of the project,which assigned full-time quality inspectors and adhered to the principle of "quality one-vote veto system"and applied an information management system. In addition,the plan for excellence is planned in advance and the excellence standards are strictly enforced: the construction unit is required to prepare a superior plan in advance,and the supervision department earnestly studies the excellence plan and implements the optimal plan. Finally,application of the new technology in outburst coal seams of high gas outburst mines is introduced,and work experience of the strong aquifers in the sandstone of Pingdingshan is passed through with the application of outstanding QC achievements and experiences.
作者 孟明福 MENG Ming-fu(Henan Xingping Engineering Management Co., Ltd., Pingdingshan 467000, Chin)
出处 《煤炭工程》 北大核心 2018年第6期158-160,共3页 Coal Engineering
关键词 矿山监理 管理措施 质量控制 信息化管理 mine supervision new technology quality control information management
  • 相关文献

参考文献3

二级参考文献11

共引文献14

同被引文献53

引证文献2

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部