隧道开挖施工的爆破振动监测与控制技术 被引量:4

The Blasting Vibration Monitoring and Control Technology in Tunnel Excavation Construction
下载PDF
导出
摘要 主要以3237线平山湖(蒙甘界)—祁连(青海)公路的平山湖—甘州区段隧道工程开挖为研究对象,对隧道工程开挖施工爆破地震波的振动监测方法及控制技术进行相关研究。旨在确保施工段地面建筑群的安全和该隧道工程开挖爆破作业的安全。研究隧道开挖施工的爆破振动检测与控制技术对隧道建设有现实意义。 This article is taking the section of Pingshan Lake to Ganzhou tunnel engineering excavation of line 3237 Pingshan Lake (the border between Inner Mongolia and Gansu) to Qilian (Qinghai) highway as the research object. And researches the vibration monitoring method and control technology of blasting seismic wave of highway tunnel excavation. The purpose is to ensure the safety and ground buildings and excavation construction safety in the tunnel excavation construction process. To research the blasting vibration monitoring and control technology has practical significance to tunnel construction.
作者 任书法 REN Shu-fa(Heilongjiang Longjian Road and Bridge Co. Ltd. First Engineering Co. Ltd., Harbin 150000, China)
出处 《工程建设与设计》 2018年第12期174-175,共2页 Construction & Design for Engineering
关键词 隧道 施工 爆破振动检测 控制 技术 tunnel construction blasting vibration detection control technique
  • 相关文献

参考文献1

共引文献25

同被引文献23

引证文献4

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部