摘要
吉隆坡大马城北站基坑工程地下基岩岩溶、裂隙、溶洞极为发育,在施工中,采用帷幕注浆、桩脚加固注浆以及压密注浆对基坑进行防水加固,并采用吕荣测试和抽水试验对注浆效果进行评价,结果表明,大马城北站基坑工程注浆封水效果显著,达到了基本防水要求。
For the bed rock of the foundation pit of the Bandar Malaysia North Station(BMNS) in Kuala Lumpur,the karst, fissure and cave are very developed, and curtain grouting, spud grouting and compaction grouting wereconducted to achieve waterproofing and reinforcement. A Lugeon test and pumping test were carried out to test thegrouting performance. The results show that the waterproofing effect of the Bandar Malaysia North Station(BMNS) issignificant, meeting the basic requirements for waterproofing.
作者
冯庆元
曹建磊
FENG Qingyuan;CAO Jianlei(Dong Fang Tunnel Sdn. Bhd., Malaysia, Kuala Lumpur, 55100)
出处
《现代隧道技术》
EI
CSCD
北大核心
2018年第3期193-199,共7页
Modern Tunnelling Technology
关键词
裂隙注浆
岩溶
深基坑
吕荣测试
抽水实验
Fissure grouting
Karst
Deep excavation
Lugeon test
Pumping test