3Simutis R, Dilijonas D, Bastina L (2008) Cash demand forecasting for ATM using neural networks and support vector regression algorithms. In: International conference 20th EURO miniconference "Continuous Optimization and Knowledge-Based Technologies"(EurOPT-2008) Neringa, LITHUANIA. ISBN 978-9955-28-283-9.
4Castro J (2009) A stochastic programming approach to cash management in banking. Eur J Oper Res 192:963 - 974.
5Gates M, Scarpa A. Preliminary Cumulative Cash Flow Analysis[J]. Cost Engineering, 1979 ( 6 ): 243-249.
6Peer S . Application of Cost-flow Forecasting Models[J]. Construction Division, 1982 (2): 226-232.
7Hudson K W. DHSS Expenditure Forecasting Method[J]. Chartered Surveyor Building and Quantity Surveying Quarterly, 1978 (3): 42-45.
8Berny J, Howes R. Project Management Control Using Real-time Budgeting and Forecasting Models[J]. Construction Papers, 1982 ( 1 ): 19-40.
9Boussabaine A H, Kaka A P. Anural Networks Approach for Cost Flow Forecasting[J]. Construction Management and Economics, 1998 (4): 471-479.
10Kaka A P, Lewis J. Development of a Company-level Dynamic Cash Flow Forecasting Model[J]. Construction Management and Economics, 2003 ( 7 ): 693-705.