摘要 文章通过位于某水库右岸引水隧洞的施工过程从岩石力学的观点出发,运用新奥法施工原理对隧洞洞挖及一次支护施工方案进行了阐述。隧洞在开挖过程中,蕴藏在山体中的地应力由于开挖成洞而产生再分配,承载地应力的主要是围岩体本身。使围岩体自身的承载能力得到最大限度的发挥,同时起到了安全储备和装饰美化作用。 In line with the construction process of a water diversion tunnel located on the right bank of a reservoir,based on the view of rock mechanics,this paper applied the theory of New Australian Tunnelling Method( NATM) to describe tunneling and one time support scheme. The crustal stress contained in the mountainous body generated redistribution due to excavation during the process of tunnel excavation,and the bearing stress was mainly the surrounding rock body itself,which resulted in the limited effects of the bearing capability of surrounding rock,meanwhile,taking the roles of safe storage and decorating and beautifying.
作者 吴小静 WU Xiao-jing(Yili River Basin Development and Construction Management Bureau, Yili 835400, Chin)
出处 《黑龙江水利科技》 2018年第2期52-54,共3页 Heilongjiang Hydraulic Science and Technology
关键词 隧洞 新奥法施工 支护方案 tunnel construction with New Australian Tunnelling Method (NATM) support scheme
  • 相关文献

参考文献3

二级参考文献3

  • 1公路工程隧道施工技术规范[S].北京:人民交通出版社,1995.
  • 2公路隧道施工[M].北京:人民交通出版社,2003.
  • 3路桥工程施工新技术实用手册--隧道施工新技术分册[M].北京:长征出版社,2006.

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部