摘要
当前,满堂高支架施工工艺在各种基础设施施工中应用广泛,其主要分为两种,一是碗扣式脚手架,二是扣件式脚手架。文章主要结合大坡渡槽工程实例,分析了扣件式满堂高支架施工中的预压试验。
Currently,the technology of full high holder construction is applied widely in all kinds of infrastructure construction,and it is composed of two: one is bowl type scaffolding and the other is fastener type steel tube scaffold. Combined with the slope aqueduct project,this paper analyzed the preloading test of fastener type scaffold construction.
作者
方芳
FANG Fang(Guizhou Rivers Supervision Ltd. , Guiyang 550001 ,China)
出处
《黑龙江水利科技》
2018年第2期55-57,共3页
Heilongjiang Hydraulic Science and Technology
关键词
大坡渡槽
满堂高支架施工
预压试验
slope aqueduct
construction with full high holder
preloading test