期刊文献+

基于地铁施工降水回用管理办法及对策探析 被引量:1

Management Measures and Countermeasures of Precipitation Reuse based on Subway Construction
下载PDF
导出
摘要 根据沈阳城区地铁建设及建筑工程施工降水实际,确立了降水回用原则,在估算了施工降水量平衡的基础上,确立了地铁降水回用"源头控制、补灌优先、就近回用、统筹考虑、近远结合"的一系列原则,提出回用管理办法及政策。 according to the Shenyang city subway construction and the construction of the actual precipitation, established by the principle of back precipitation, precipitation in the estimation of foundation construction balance, established by a series of principles of source control, irrigation, the nearest priority reuse,and consider the combination of near and far " back to the subway precipitation, put back with the management measures and policies.
作者 聂文欢 NIE Wen-huan(Yingkou Hydrological Bureau, Yingkou 115003, China)
出处 《黑龙江水利科技》 2018年第3期138-141,共4页 Heilongjiang Hydraulic Science and Technology
关键词 降水回用 水量平衡 管理 对策 precipitation reuse water balance management Countermeasures
  • 相关文献

参考文献4

二级参考文献8

  • 1[1]GB 50014-2006,室外排水设计规范[S].北京:中国计划出版社,2006.
  • 2中国铁道科学研究院深圳研究设计院.嘉里建设广场二期、茂业和平广场钻探取样成果及土工试验报告.深圳:深圳蛇口华力工程有限公司,2008.
  • 3嘉里置业(深圳)有限公司.深圳嘉里建设广场二期基坑支护工程设计说明.深圳:深圳市勘察测绘院有限公司,2008.
  • 4深圳市地铁有限公司城市轨道交通安全保护区施工管理办法(暂行),深圳市地铁有限公司,2007.
  • 5施工对城市轨道交通设施及运营安全影响评估咨询合同,嘉里置业(深圳)有限公司、中国铁道科学研究院深圳研究设计院,2008.
  • 6付刚.地铁降水方法研究与应用[M]北京,2005.
  • 7荀涛.地下水回收再利用技术[J].工程质量,2008,26(1):33-36. 被引量:4
  • 8GB 50318-2000.城市排水工程规划规范[S]..2000

共引文献19

同被引文献14

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部