4Mario Golger,Giorhio, H. O, Friedrich Prinzl. ThePir Panjal Railway Tunnel [ J ] ? Geomechanics andTunneling,2014(2) : 133-141.
5Pillai A S,Tiwari A K. Enhanced PERT forProgramme Analysis, Control and Evaluation : Pace[J ]. International Journal of Project Management,1995(1) : 39-43.
6Kim K,Jesus M. de la Garza. Critical Path Methodwith Multiple Calenders [ J ] ? Journal of ConstructionEngineering and Management - ASCE,2005 (3) :330 -.
7Wilde E. Engineering Project Control [ J ]. ProjectManagement,1995(12) :279 -283.