摘要 本文介绍了葛洲坝电站轴流转桨式水轮发电机组主轴密封的两种不同形式,自补偿性轴向端面工作密封的具体结构、工作原理以及调整过程。工作密封调整的主要工作是抗磨板水平调整以及密封块与抗磨板间隙调整。由于抗磨板的水平直接影响到主轴密封的寿命和封水性能,安装不当会造成密封漏水甚至烧结,因此在安装过程中,其水平的调整就显得尤为重要。本文总结了两种抗磨板水平调整方法的优缺点,提出了第三种能够结合前两者优点的调整方法,对这种主轴密封的两大主要部件——抗磨板和密封块的安装、水平测量和调整工艺进行了分析和探讨,初步分析了抗磨板水平波浪度产生的原因。为提高工作密封的安装效率,改进调整工艺提供了一定的技术参考。 This article introduced two different structure types of the Kaplan Turbine Main Shaft Sealing in gezhouba station,the working principle and the adjustment process of the self-compensated axial shaft seal.The main task for adjusting the shaft seal is to adjust the levelness of the the wearing ring and the clearance between the wearing ring and the flat seal.since the levelness of the wearing ring can directly affect the life expectancy and the water seal performance of the shaft seal,improper Installation may cause water leakage and even sinter of the shaft seal,thus the levelness adjustment is very important.Two methods for adjusting the levelness of the wearing ring are introduced,the third method that combines advantages of the former two methods are proposed.This paper discussed and analyzed the installation,level adjustment and measurement of the two major components—wearing ring and flat seal,gave analysis the wave degree of the wearing ring.The author hoped this article can provide technical reference for the installation and adjustment of shaft seal.
作者 叶文波 万乾钰 黄奎 成传诗 杨豆思 王永业 YE Wenbo;WAN Qianyu;HUANG Kui;CHENG Chuansh;YANG Dousi;WANG Yongye(China Yangze power Co., Ltd., Yichang 443002, Chin)
出处 《水电与抽水蓄能》 2018年第3期47-50,110,共5页 Hydropower and Pumped Storage
关键词 葛洲坝电站 主轴密封 工作原理 安装 调整 gezhouba hydropower plant the shaft seal working principle installation adjustment
  • 相关文献

参考文献4

二级参考文献3

共引文献13

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部