摘要
丰满水电站是我国第一座大型水电厂,由于建设期的历史原因导致诸多先天性缺陷,加之已达设计使用寿命并超期服役,虽经多次加固补强,但未能从根本上彻底解决问题。通过综合分析坝体混凝土、金属结构等运行现状和洪水复核情况,对丰满大坝运行状态进行评价。
Fengman Hydropower Station is the first large hydropower plant in China.Due to the historical reasons during the construction,the dam owns many congenital defects.In addition with the fact that the dam has reached its design life and is still under operation,the problem could not be solved completely though several reinforcement and strengthening procedures have been applied.In this paper,the operation condition of Fengman Hydropower Dam is evaluated under the comprehensive analysis of the flood check and the operation condition such as the concrete and the metal structure of the dam.
作者
张永鑫
王进
于承跃
李英杰
ZHANG Yongxin;WANG Jin;YU Chengyue;LI Yingjie(Fengman Hydropower Plant, Jilin 132108, China)
出处
《水电与抽水蓄能》
2018年第3期80-85,共6页
Hydropower and Pumped Storage
关键词
坝体混凝土
金属结构
运行状态
丰满水电站
dam concrete
metal structure
operation condition
Fengman Hydropower Station