随着我国对社会建设的重视,在多项基础设施工程中,如桥梁、道路工程,广泛应用了现浇箱梁及预制箱梁施工技术。现浇箱梁及预制箱梁施工技术,通过自身较好的稳定性,高性能,变形幅度小等优势,在基础设施工程中被大规模应用,但基于现状分析,其在部分施工中仍存在不足,因此,针对现浇箱梁及预制箱梁施工技术进行探讨。
With the importance of social construction in China, the technology of cast-in-place box girder and precast box girder has been widely applied in many infrastructure projects, such as bridges and road projects.The construction technology of precast box girders and concrete box girder, through its stability, high performance, small deformation range advantages are large-scale application in social infrastructure project, but the status quo on the basis of the analysis, in the part of the construction is insufficient, therefore, in this paper, according to the construction technology ofprecast box girders and cast-in-place box girder to explore.