摘要
随着电力公司各业务条线信息系统建设和应用的不断深入,暴露出跨专业业务协同与信息共享不足,数据多头输入,数据准确性、实时性不强,数据反复抽取、冗余存储、质量不高等问题。为了进一步提升数据贡献、业务融合的程度,提出了全业务统一数据中心建设架构设计方法,主要分为3部分:数据处理中心、数据分析中心、数据管理中心,进而实现企业数据的集中管理及统一访问。
Business information system has been increasingly applied in electric power industry.However,there is still much room for improvement based on current business collaboration,information sharing,multi-data input,data accuracy,real time,repeated data extraction,redundant storage and data quality.In order to further the convergence between data contribution and business,in this paper,we proposed a method to design full service unified data center construction framework.This framework mainly includes three parts:the data processing center,the data analysis center,the data management center.Thus we can realize the centralized management and unified access to corporate data.
作者
曾楠
陈志刚
窦昊翔
姚剑
郭爱群
Zeng Nan;Chen Zhigang;Dou Haoxiang;Yao Jian;Guo Aiqun(State Grid Corporation of China, Beijing 100017;State Grid Jiangsu Electric Power Company, Nanjing 210029;State Grid Jiangsu Electric Power Company Information&Telecommunication Branch, Nanjing 210023;YOYO SYSTEMS INC, Beijing 100022)
出处
《微型电脑应用》
2018年第6期19-22,共4页
Microcomputer Applications