摘要
双面叠合剪力墙结构Allplan深化设计流程应用研究为国家重点研发计划子课题研究内容。现阶段装配式建筑的发展尚处于初期阶段,装配式建筑的设计流程不完善,工作界面尚不清晰。在大量装配式项目设计的基础上,提出了一套装配式建筑设计流程及双面叠合剪力墙结构采用Allplan软件的深化设计流程。
Application research of detailed design process for double-wall composite shear wall structure based on Allplan is the research content of the national key RD program of China,the development of prefabricated buildings is still in an early stage,prefabricated building design process is not perfect and the work interface is not clear. This paper proposes a design processes of prefabricated buildings and Allplan detailed design process for double-wall composite shear wall based on a large number of prefabricated project designs.
作者
樊骅
恽燕春
方松青
丁泓
张明俊
FAN Hua;YUN Yanchun;FANG Songqing;DING Hong;ZHANG Mingjun(Shanghai Baoyue Real Estate Development Co. , Ltd. ,Shanghai 201107, China)
出处
《施工技术》
CAS
2018年第12期30-34,共5页
Construction Technology
基金
国家重点研发计划资助(2016YFC0701700)
关键词
装配式建筑
剪力墙
双面叠合剪力墙
设计
深化设计
prefabricated construction
shear walls
double-wall composite shear walls
design
detailed design