基坑开挖对地铁隧道影响的有限元分析 被引量:4

Finite element analysis of effect of foundation pit excavation on subway tunnel
下载PDF
导出
摘要 长江航运总医院基坑工程位于地铁区间隧道上方,坑底距离左线隧道最小距离9 m,平面距隧道中线9 m内不可布桩。探讨了采用灌注桩-转换大梁基础方案的可行性,并基于二维有限元法针对多个施工步骤模拟基坑开挖的全过程,分析了各开挖阶段隧道的变形及受力特性。 The foundation pit of Changhang Hospital is located above the metro tunnel. The minimum distance between the pit bottom and the left tunnel is 9 meters. It is not allowed to arrange piles within 9 meters between the plane and the center line of tunnel. In this paper,the possibility to adopt the cast-in-situ piles and large transfer beams was discussed,the whole process of foundation pit excavation in view of several construction procedures was simulated based on the two-dimensional finite element method,and the deformation and mechanical behavior of tunnels at each excavation stage were analyzed.
作者 葛畅 Ge Chang(No. 4 Architecture Design Institute, Tongji Architectural Design (Group) Co. , Ltd. , Shanghai 20009)
出处 《工程建设》 2018年第6期24-27,共4页 Engineering Construction
关键词 基坑开挖 既有地铁隧道 有限元分析 变形 foundation pit excavation existing subway tunnel finite element analysis deformation
  • 相关文献

参考文献3

二级参考文献20

共引文献52

同被引文献19

引证文献4

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部