WZ11-1 WHPA平台上部模块为非对称结构,给出了上部模块的称重方案,分析了风险,并对操作流程进行了详细阐述。
The upper module of WZ11-1 WHPA platform is of asymmetric structure,the weighing scheme for upper module is given,the risk is analyzed,and the operation process flow is described in detail.
作者
钟芳
Zhong Fang(Zhanjiang Nanhai Western Petroleum Prospecting Design Co. , Ltd, Zhanjiang 524057, Guangdon)
出处
《工程建设》
2018年第6期67-70,共4页
Engineering Construction