期刊文献+

新电改背景下电网企业综合能源服务商业模式研究 被引量:18

Business Model of Integrated Energy Service of Grid Enterprises in the Context of New Electricity Reform
下载PDF
导出
摘要 新电改方案实施后,由于输配电价的改革和售电侧的放开,电网企业的盈利模式也随之发生了变化。这就要求电网企业转变服务理念与经营方式,来寻求竞争优势。基于"魏朱六要素商业模式"模型,对电网企业综合能源服务商业模式进行了分析,寻找电网企业未来拓宽盈利的途径,保障了企业在电改形势下可持续健康发展。 After the implementation of the new electricity reform scheme,the profit model of power grid enterprises has changed with the reform of the transmission and distribution price and the release of the electric sales.All these require power grid enterprises to transform service philosophy and operation mode to seek competitive advantage.Using the Weizhu six elements of business model theory,this paper analyzes the business model of integrated energy service of power grid enterprises in order to find the ways to expand the profit in the future,and guarantee the long-term sustainable development of the power grid enterprises in the context of the new electricity reform.
作者 黄建平 俞静 陈梦 赵伟博 王思羽 HUANG Jianping;YU Jing;CHEN Meng;ZHAO Weibo;WANG Siyu(State Grid Zhejiang Electric Power Co. , Ltd. , Hangzhou 310007, China;Zhejiang Huayun Information Technology Co. , Ltd. , Hangzhou 310052, China;School of Economics and Management, NCEPU, Beijing 102206, China)
出处 《电力与能源》 2018年第3期344-346,399,共4页 Power & Energy
关键词 电力市场改革 综合能源服务 魏朱六要素 商业模式 electricity market reform integrated energy service Weizhu six elements of business model theo-ry business model
  • 相关文献

参考文献4

二级参考文献33

  • 1European Commission. European technology platform for the electricity networks of the future[EB/OL]. [2015 -04 -30]. http.//www.smartgrids.eu/.
  • 2GEIDL M. Integrated modelling and optimization of multi- carrier energy systems[D]. Zurich, Switzerland: ETH, 2007.
  • 3HubNet Project. Multi vector energy sytems theme of the EPSRC HubNet project[EB/OL]. [2015-04-30]. http~//www. huhnet.arg.uk/themes/multi_energy.
  • 4National Renewable Energy Laboratory. Energy systems integration projeet[EB/OL]. E2015-04 301. http://www, nrel. gov/esi/.
  • 5The AB Group[EB/OL]. [2015 04-30]. http ://www.gruppoab. it/en/guida_alla cogenerazione/cogenerazione.asp.
  • 6National Grid. Gas ten year statement 2014[EB/OL]. [2015-04- 30]. http ://www2. nationalgrid.com/UK/Industry-information/ Future-of Energy/Gas-Ten Year-Statement/.
  • 7European Union. 2030 climate and energy policy framework [EB/OL]. [2015-04-30]. http=//ec, europa, eu/clima/policies/ 2030.
  • 8QADRDAN M, CHAUDRY M, WU J, et al. Impact of a large penetration of wind generation on the GB gas network[J]. Energy Policy, 2010, 38(10): 5684-5695.
  • 9Walesi~.West Utilities. Innovation of Wales~West utiIities[EB/ OL]. [2015-04 -30]. http://www, wwutilities, co. uk/innovalion. aspx.
  • 10Danish energy agency[EB/OL]. [2015-04- 30]. http://www. ens. dk/.

共引文献230

同被引文献103

引证文献18

二级引证文献53

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部