摘要
随着我国交通建设的发展逐渐加快,地铁交通建设也越发繁荣,且为我国地铁隧道的施工发展做出了较大贡献。论文将综合管廊暗挖施工对地铁隧道影响的数值分析作为研究对象,通过对工程概况的简单阐述,分别从建立有限元模型模拟以及模型试验数值分析对综合管廊暗挖施工对地铁隧道的影响进行详细研究与分析。
With the gradually rapid development of traffic construction in our country, the subway traffic construction is also becoming more and more prosperous, and it has made great contribution to the development of construction of subway tunnel in our country. The paper takes the numerical analysis of the influence of underground excavation construction of comprehensive pipe gallery on the subway tunnel as the research object. Based on the brief introduction of the project, the influence of underground excavation construction of comprehensive pipe gallery on subway tunnel is studied and analyzed in detail from the establishment of finite element mode simulation and numerical analysis of mode test.
作者
郭小伟
吴瑞绚
GUO Xiao-wei;WU Rui-xuan(S 1NOHYDRO Bureau 11 Co. Ltd., Zhengzhou 450000, China)
出处
《中小企业管理与科技》
2018年第16期145-146,共2页
Management & Technology of SME
关键词
综合管廊暗挖施工
地铁隧道
数值分析
underground excavation construction of comprehensive pipe gallery
subwaytunnel
numerical analysis