四合一反应器吊装新武器

New Weapon for the Hoisting of Four-in-One Reactor
下载PDF
导出
摘要 华北石化130万吨/年连续重整装置大型超限设备主要数量较多,连续重整反应器重量最大、长度最长,就位在反再框架2、3轴内部13.5m层平台基础上,是本工程项目的核心设备。论文就四合一反应器吊装新武器在工程的施工进度和安全性、经济性,综合比较下进行阐述。 The main quantity of large over-limit equipment of continuous catalytic reforming unit of 1.3 million tons per year of Huabei Petrochemical is large.The continuous reforming reactor has the largest weight and the longest length, and is located in the anti reframe 2, 3 axis internal 13.5 m platform platform, and is the core equipment of this project. This paper expounds the construction progress, safety, economy and comprehensive comparison of the new hoisting weapons of four-in-one reactor.
作者 李志敏 陈博 吕旭 LI ZHi-mim;CHEN Bo;LV Xu(China Petroleum 6th Construction Company, Guilin 541004, China)
出处 《中小企业管理与科技》 2018年第16期163-164,共2页 Management & Technology of SME
关键词 反应器吊装 吊盖连接件 有限元核算 reactor hoisting hanging cover connector finite element accounting
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部