通过对建筑电气工程造价审核中出现的定额套用、换算不合理、实际工程量与上报工程量不符合、材料价格把控难度大等常见问题进行分析,提出了具有针对性的解决措施,有助于造价审核工作顺利开展,保证审核的科学性、完整性、准确性。
This article from the construction electric project cost audit the quota applies,the conversion is unreasonable. The actual amount of work and the reported amount of work do not match. The completion diagram is very different from the construction diagram. The material price analyses the common problems such as the difficulty of controlling,and puts forward the concrete measures of scientific,pertinence and accuracy.
作者
刘燕芳
Liu Yanfang(Engineering Department, Ancient Book Mine, Jincheng Coal Industry Group, Jincheng 048000, Chin)
出处
《山西建筑》
2018年第13期230-231,共2页
Shanxi Architecture
关键词
电气工程
造价审核
解决措施
electrical engineering
cost auditing
solution