期刊文献+

IPD的发展状况及推动力分析

Analysis on impetus of IPD based on current status of its development
下载PDF
导出
摘要 探讨一种新兴的、具有巨大潜在经济价值的建筑工程项目交付模式——IPD(Integrated Project Delivery,集成项目交付)的推动力。在概述目前IPD在国外的理论研究与实际应用状况的基础上,总结IPD的推动力来源,并重点分析每一种推动力的内在动机、外在行为及所受制约条件,揭示对我国推动IPD实施的启示。对于IPD在我国的推广和应用具有重要参考价值。 This paper discusses the impetus of IPD( Integrated Project Delivery) which is a newly arisen project delivery method for building construction and is considered to bring tremendous economic benefit to the participants. After reviewing the theoretical development of IPD and its physical application in foreign countries,it tallies up the impetus of IPD and analyses the inside motivations,outside behaviors and practical constraints of the participants including companies,associations and governments. Then the critical issues for implementing IPD in China are suggested. This paper is valuable to the implementation of IPD in the AEC industry in China.
作者 林方醒 Lin Fangxing(Guangdong Provincial Academy of Building Research Group Co. , Ltd, Guangzhou 510500, China)
出处 《山西建筑》 2018年第13期237-239,共3页 Shanxi Architecture
关键词 IPD 推动力 交付模式 建筑工程 IPD impetus project delivery method construction engineering
  • 相关文献

参考文献1

二级参考文献12

  • 1Feniosky Pena-Mora, Michael Li. Dynamic planning and control methodology for design/build fast-track construction projects [ J ]. Journal of Construction Engineering and Management, 2001, 127 (1): 1-17.
  • 2George Elvin. Integrated practice in architecture: Mastering design-build, fast- track, and building information modeling [M]. New Jersey: John Wiley and Sons, 2007.
  • 3AIA Nation/AIA California Council. Integrated project delivery: a guide [M/OL]. Washington: The American Institute of Architects, 2007 [2010-10-30]. http: //www. betterbricks. com/ graphics/assets/documents/AIA-_ IPD_ Guide 2007. pdf.
  • 4David C Kent, Burcin Becerik-Gerber. Understanding construction industry experience and attitudes toward integrated project delivery [ J ]. Journal of Construction Engineering and Management, 2010, 136 (8): 815-825.
  • 5Gregory A Howell. What is lean construction [ C]//Iris D Tommelein, Glenn Ballard. Proceedings of the 7th annual conference of the International Group for Lean Construction. Berkeley: IGLC-7, 1999.
  • 6Patrick J OConnor. Integrated project delivery: collaboration through new contract forms [ M/OL ]. Minneapolis: Faegre & Benson LLP, 2009 [2010-10-30]. http: //www. faegre. com/webfiles/AGC- IPD% 20Paper. pdf.
  • 7Jonathan Cohen. Integrated Project Delivery: Case Studies [M/OL]. Sacramento: AIA California Council, 2010 [ 2010- 10- 30 ]. http: //www. klingstubbins, com/about/ pdfs_ articles/Jan_ 01_ 10_ AIA IPD% 20CaseStudies_ Autodesk. pdf.
  • 8Owen Matthews, Gregory A Howell. Integrated project delivery an example of relational contracting [ J ]. Lean Construction, 2005, 2 (1) : 46-61.
  • 9McGraw- Hill Construction, AIA California Council. Integrated project delivery: A Working Definition [ M]. Sacramento: AIA California Council, 2007.
  • 10Mark Konchar, Victor Sanvido. Comparison of US project delivery systems [ J ]. Journal of Construction Engineering and Management, 1998, 124 (6): 435-444.

共引文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部