葛洲坝大江电站水轮发电机导轴承结构优化方案 被引量:1

Optimal Scheme for Guide Bearing Structure of Hydro-Generator in Gezhouba Dajiang Power Station
下载PDF
导出
摘要 详细地介绍了葛洲坝电站原上导轴承结构,并对上导轴承瓦支撑不稳、支撑调整量不准问题进行分析,并结合机组实际情况进行结构优化设计,对原机组的上导轴承结构进行更新优化,从而解决该问题,并对后续设计和类似的问题处理提出了一个指导性方案。 This paper introduces the structure of original upper guide bearing of Gezhouba power station in detail,and analyzes the problems of instable support of upper guide bearing bush and inaccuracy adjusting amount of support. The optimal design of the structure is carried out combined with actual situation of the unit,and the structure of original upper guide bearing is updated and optimized so as to solve the problems. A guiding direction to solve subsequent design and similar problems is given.
作者 王昆 Wang Kun(Harbin Electric Machinecy Company Limited, Harbin 150040, China)
出处 《防爆电机》 2018年第3期24-25,36,共3页 Explosion-proof Electric Machine
关键词 上导轴承结构 上导轴承瓦支撑不稳 支撑调整量 Upper guide bearing strueture instable supporting of upper guide bearing bush adjusting amount of supporting
  • 相关文献

参考文献3

二级参考文献4

  • 1.赴ABB公司学习资料[Z].,..
  • 2.引进ABB公司磁极线圈图纸、文件[Z].,..
  • 3.三峡水轮发电机技术规范.[S].,..
  • 4Richard L., "Nailen. Sleeve bearing load limits " ELECTRICAL APPARATUS, pp. 45 JUNE 2003.

共引文献2

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部