期刊文献+

江苏地区电网项目造价风险管理研究

Research on Cost Risk Management of Power Grid Projects in Jiangsu Province
下载PDF
导出
摘要 "十三五"电网规划和电力建设主管部门要求提高电力投资的效率,有效防控电网项目造价风险。本文通过建立电网项目造价风险矩阵和访谈调研,采用模糊数学分析法对电网项目各阶段造价风险环节进行了风险等级评估,认为初步设计、编制结算书、审批施工结算、编报结算报告和项目结算监督阶段风险较高。结合电网项目造价管控实践分析相应六个方面的造价风险因素,提出电网项目造价风险管控措施,有助于江苏地区电网投资效率的进一步提升。 The "Thirteenth Five-Year Plan" power grid planning and power construction authorities are required to improve the efficiency of power investment and effectively prevent and control the cost risk of power grid projects. This paper establishes a cost risk matrix for grid projects and conducts interviews and surveys. It uses fuzzy number analysis to assess the risk level of each stage of the grid project's cost risk stages, and clarifies the preliminary design, preparation of a statement of settlement, approval of construction settlement,and preparation of settlement reports and projects. The risk in the settlement supervision stage is relatively high. Combine the cost control of power grid projects to analyze the corresponding six aspects of the cost risk factors, and put forward the grid project cost risk management and control measures, which will help to further enhance the efficiency of Jiangsu regional power grid investment.
作者 张华 翟晓萌 诸德律 Zhang Hua;Yan Xiao-meng;Zhu-de Lu(State Grid Jiangsu Electric Power Co., Ltd., Jiangsu, Nanjing 211008, China)
出处 《江苏商论》 2018年第6期16-18,共3页 Jiangsu Commercial Forum
基金 国家电网公司总部科技项目(SGTYHT/16-JS-198)
关键词 电网项目 模糊分析 造价风险 风险管理 grid project fuzzy analysis cost risk risk management
  • 相关文献

参考文献3

二级参考文献13

共引文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部