5Brucker,P.,Drexl, A., Mohring, R., Neumann, K.and Pesch,E. Resource-constrained project scheduling: Notation, classification,models and methods [J ]. European Journal of Operational research, 1999, (112) :3-41.
6J.P. Stinson, E.W. Davis, and B.M. Khumawala.Multiple resource-constrained scheduling using branch and bound[J]. AIIE Transactions, 1978,(10) :252-259.
7Sonke Hartmann. A Self-Adapting Genetic Algorithm for Project Scheduling under Resource Constraints[J].Naval Research Logistics,2002,(49):433-448.
8J.H.Cho and Y.D.Kim. A simulated annealing algorithm for resource-constrained project scheduling problems[J]. Journal of the Operational Research Society, 1997, (48): 736-744.
9Gray C,Dwo ratschek,et al,International comparison of project organization structures: use and effectiveness[J]. Project Management,1990,(8):26-32.
10Gobeli D,L arson E. Relative effectiveness of different project structures[J]. Project Management Journal, 1987, (18) :81-85.