摘要
针对660MW超临界直接空冷机组调试中遇到的难题、易发问题进行分析,找出原因,并提出适当的应对策略,以确保机组试运顺利推动。
In view of the difticulties and problems encountered in the debugging of 660 MW supercritical direct air cooling generating set, this paper makes an analysis and finds out the causes, and appropriate strategies are proposed to ensure asuccessful trial operation of the generating set.
作者
贺宏彦
HE Hongyan(Tongmei Da tang Tashan NO. 2 Power Generation Co. , Ltd , Datong 037000, Chin)
出处
《电工技术》
2018年第10期64-65,68,共3页
Electric Engineering
关键词
调试
参数优化
中压主汽门
漏氢
盘车
闷缸
debugging
parameter optimization
intermediate pressure main valve
hydrogen leakage
turning gear
cylinder holding