摘要
结合援外项目的特点,对多联式空调机组配电及保护的重点问题进行分析。通过将实测数据与理论计算进行对比,从配电干线负荷计算、断路器额定电流的修正、电压偏差、防雷击及电气安全、自然环境条件等方面提出多联式空调机组电气设计的重点问题和解决方案。
According to the discussion about the electrical design points of multi-coupled air conditioning units in foreign aid project. Based on the data from practical testing, giving some solutions in the following aspects, such as distributing main load calculation, correct of rated current of circuit breaker, decrease voltage deviation,lightning protection & electrical safety and natural environmental condition.
作者
韩全胜
刘朔辰
阎博萱
Han Quansheng;Liu Shuochen;Yan Boxuan(Beijing Institute of Architectural Design,Beijing 100045 ,China)
出处
《智能建筑电气技术》
2018年第3期21-24,共4页
Electrical Technology of Intelligent Buildings
关键词
援外项目
多联式空调机组
电气设计
foreign aid project
multi-coupled air conditioning units
electrical
design