摘要
万达集团在"总包交钥匙管理模式"的基础上引入了以BIM技术为基础、通过项目信息化集成管理平台进行管理的"BIM总发包管理模式",该模式的核心是实现"BIM一键式算量"。要顺利实现模型一键式算量非常重要的前提条件是必须保证模型的正确性和规范性。本文重点论述总发包管理模式下作为施工总包方如何高效、快速地进行模型审查。
Based on the management mode of General Contractor Offering Keys,the Wanda Group introduces the general contractor management mode with BIM,which applies the BIM technology and the information integrated management platform to achieve the core target of One-Button Quantity Calculation with BIM. To successfully implement the one-button quantity calculation,a very important prerequisite is to ensure the correctness and normalization of the model. This paper focuses on how to conduct the model reviewing efficiently and quickly as the contractor under the general contractor management mode with BIM.
作者
杨鸿玮
任杰
邵刚
郭林飞
许东芹
Yang Hongwei, Ren Jie, Shao Gang, Guo Linfei, Xu Dongqin(Group Co. , Ltd. , Yibin 644000, China)
出处
《土木建筑工程信息技术》
2018年第2期35-39,共5页
Journal of Information Technology in Civil Engineering and Architecture
关键词
BIM总发包
模型审查
五步曲
图模一致
General Contract with BIM
Model Review
Five Sections
The Drawing Consistent with Model