邻避项目社会稳定风险防控体系的三重建构 被引量:2

Triple Construction of Social Stability Risk Prevention and Control System of NIMBY Projects
下载PDF
导出
摘要 邻避项目社会稳定风险是技术生产、制度诱发和认知塑造共同作用的结果。新时期,我国工程项目建设诱发的技术性风险、制度性风险、文化认知风险依然大量存在。基于这三种风险在推进社会治理精细化的背景下,邻避项目社会稳定防控体系的三重建构可以延缓风险发生、规避风险以至实现风险的有效应对。 The risk of social stability in the NIMBY projects is the result of combined effects of technology production,institutional induction and cognitive shaping.In the new era,the technical risks,institutional risks,and cultural cognitive risks induced by project construction still exist.Under the background of advancing the refinement of social governance,the triple construction of social stability prevention and control system for NIMBY projects can delay the occurrence of risks,avoid risks,and achieve effective response to risks.
作者 王伯承
出处 《地方治理研究》 2018年第3期52-69,共18页 Local Governance Research
基金 国家社科基金重大项目"特大城市社会风险系统治理研究"(16ZDA083)
关键词 邻避项目 社会稳定风险 风险治理 技术风险 制度风险 文化认知风险 风险防控 NIMBY project social stability risk risk governance technical risk institutional risk cultural cognitive risk risk prevention and control
  • 相关文献

参考文献30

二级参考文献342

共引文献1548

同被引文献41

引证文献2

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部