摘要 堤岸周围的抛石分布难以查清,对顶管工程会造成较大影响。在前人研究的基础上,以珠海第四条对澳门供水管道工程为例,通过岩土勘察和工程物探,探讨在局部工作面受限制、无法进行钻探的情况下如何进行抛石区的勘察和顶管施工,并提出可能存在的问题与建议。 The riprap distribution around the embankment is hard to check out, which will cause the greater influence on the pipe jacking construction. On the basis of the former study, taking the fourth water supply pipeline project to Macao from Zhuhai as an example, and according to the geotechnical survey and engineering geophysical exploration, the article discusses how to carry out the survey and pipe jacking construction of riprap area in the case of limited working face and no drilling, and puts forward the possibly existing problems and proposals.
作者 宋健
出处 《城市道桥与防洪》 2018年第7期234-235,243,共3页 Urban Roads Bridges & Flood Control
关键词 顶管 块石 工作面受限 pipe jacking rubble limited working face
  • 相关文献

参考文献5

二级参考文献16

共引文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部