摘要
为解决近珠江某市政路两旁现阶段的污水排放问题,以近珠江某短距离半机械顶管工程为例,阐述高水位不成桩粉细砂地段施工过程中遇到的困难,通过比较不同解决方案的成与败,总结高水位不成桩情况下的顶管工作经验,供类似工程参考。
In order to solve the sewage discharge problems at two sides of the municipal roads in a city along Zhujiang River, taking a semi-mechanical pipe jacking project at the short distance to Zhujiang River as an example, the article sets forth the problems met in the construction process of high water level no-pile silty-fine sand section, and summarizes the pipe jacking engineering experience under the high water level no-pile condition after the comparison of the successes or failures of the different solving schemes, which can be referred for the similar projects.
出处
《城市道桥与防洪》
2018年第7期239-240,共2页
Urban Roads Bridges & Flood Control
关键词
速凝剂
内置沉井
闷顶
满堂地基处理
人工清障
accelerating admixture
built-in open caisson
stuffy jacking
entire foundation treatment
artificial barrier clearance