高水位不成桩粉细砂地段顶管工程成败案例思考 被引量:1

Thinking about Success or Failure of Pipe Jacking Engineering in High Water Level No-pile Silty-fine Sand Section
下载PDF
导出
摘要 为解决近珠江某市政路两旁现阶段的污水排放问题,以近珠江某短距离半机械顶管工程为例,阐述高水位不成桩粉细砂地段施工过程中遇到的困难,通过比较不同解决方案的成与败,总结高水位不成桩情况下的顶管工作经验,供类似工程参考。 In order to solve the sewage discharge problems at two sides of the municipal roads in a city along Zhujiang River, taking a semi-mechanical pipe jacking project at the short distance to Zhujiang River as an example, the article sets forth the problems met in the construction process of high water level no-pile silty-fine sand section, and summarizes the pipe jacking engineering experience under the high water level no-pile condition after the comparison of the successes or failures of the different solving schemes, which can be referred for the similar projects.
作者 孙安 史慧婷
出处 《城市道桥与防洪》 2018年第7期239-240,共2页 Urban Roads Bridges & Flood Control
关键词 速凝剂 内置沉井 闷顶 满堂地基处理 人工清障 accelerating admixture built-in open caisson stuffy jacking entire foundation treatment artificial barrier clearance
  • 相关文献

参考文献1

二级参考文献5

共引文献9

同被引文献11

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部