尖山包沟泥石流成因及动力学特性研究 被引量:2

Study on causes and dynamic characteristics of debris flow in Jianshanbao Ravine area
下载PDF
导出
摘要 尖山包沟区域极端气温差为40.6℃、极端地温差为77.7℃,沟域所在地区多年平均降雨量为1058 mm,24h降雨强度可达111.5 mm。流域沟内地层岩性以软质—极软质岩为主,流域内松散固体物质总量约2.0×10~7m^3;沟内相对高差达1328 m,沟床平均坡降为132.21‰;尖山包沟泥石流的爆发因素主要是丰富的固体物源、丰沛的降雨和暴雨降雨强度、陡峭的地形等。在高强度暴雨的作用下,聚集的洪水裹挟着松散固体物质沿陡峭的山沟快速向下流动而形成泥石流;泥石流流速为4.77 m/s,整体冲压力为3.71 k Pa,泥石流最大冲起高度为1.16 m,受阻爬高可达1.85 m。 In Jianshabao ravine area, the extreme temperature difference ranges 40. 6℃ and the extreme ground temperature difference ranges 77.7℃.The average annual precipitation is 1058 mm and the twenty-four hours rainfall intensity can be up to 111.5mm.The stratum lithology mainly are soft rocks and very soft rocks, and the total amount of loose solid matter is about 2.0× 10^7m3. The relative height difference in the ravineis up to 1328 m and its average gradient of ditch bed is 132. 21‰. The main factors causing the Jianshanbao ravine debris flow are rich solids source, abundant rainfall, storm rainfall intensity and steep terrain. Under the action of high intensity rainstorm, the flood carries the loose solid material and rapidly flow down along the steep ravine and form debris flow. The velocity of debris flow is 4. 77 m/s, its overall pressforce is 3.71 kPa. The maximum height of debris flow is 1.16 m and it can climb up to 1.85 m when it is blocked.
作者 刘克文 张洪宽 郭光八 余建强 张伟 LIU Ke-wen;ZHANG Hong-kuan;GUO Guang-ba;YU Jian-qiang;ZHANG Wei(The 14TM Metallurgical Construction Yunnan Invst~gation and Design co. LTD, Kunming 650093)
出处 《矿产勘查》 2018年第4期732-737,共6页 Mineral Exploration
关键词 尖山包沟 泥石流 动力特性 Jianshanbao Ravine debris flow dynamic characteristics
  • 相关文献

参考文献3

二级参考文献28

  • 1中华人民共和国国土资源部.DZ/T 0220-2006.泥石流灾害防治工程勘查规范[S].北京:中国标准出版社,2006.
  • 2四川省地质矿产局化探队.中华人民共和国1:5万地质图说明书-清平幅,H-48-17A[R].1995,11.
  • 3四川省地质工程集团公司.文家沟泥石流勘查设计书[R].2008.
  • 4张远明,杨学之.汶川县映秀镇红椿沟特大型泥石流补充勘查报告[R].成都:四川省华地建设工程有限责任公司,2010.
  • 5四川省地质矿产勘查开发局,成都理工大学,四川省地质环境监测总站,等.国道213线都江堰至汶川公路抢通保通工程地质灾害应急调查报告[R].2008.
  • 6Takashi Koi, Norifumi Hotta, Ituro Ishigaki, et al. Prolonged impact of earthquake-induced landslides on sediment yield in a mountain watershed : The Tanzawa region, Japan [ J ]. Geomorphology, 2008, 101(3) : 692 -702.
  • 7Ashby J A. Sliding and toppling modes of failure in model and jointed rock slope[D]. London: Imperial College Royal School of Mines, 1971.
  • 8Cui Peng,Chen Xiaoqing,Zhu Yinyan. The Wenchuan Earthquake (May 12 2008),Sichuan Province,China,and Resulting Geohazards[J].Natural Hazards,2009.
  • 9国土资源部.DZ/T 0220-200.泥石流灾害防治工程勘查规范泥石流灾害防治工程勘查规范[S].北京:国土资源部,2006.
  • 10费祥俊;舒安平.泥石流运动机理与灾害防治[M]北京:清华大学出版社,2004114-116.

共引文献95

同被引文献8

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部