摘要
信息时代的到来,数据网络已被广泛应用于各行各业。BZ25-1油田原有PKS控制系统停产改造,本项目制定了BZ25-1油田群中控系统FTE网络改造施工方案,工程中的技术问题按照本方案执行。根据BZ25-1油田群中控系统FTE网络项目改造设计,需要对海上各平台的中控系统(DCS)与紧急关断系统(ESD)进行相应的组态与画面修改,113中控服务器底层数据库不同步的维修,WHPA/B/C/D/E/F及194A/B平台中控系统双网改造为FTE网络、ESD系统组态服务等。
With the advent of the information age,data networks have been widely used in all walks of life.BZ25-1 oilfield original PKS control system shutdown transformation,the company formulated BZ25-1 oilfield group control system FTE network transformation construction program,technical problems in the project in accordance with the implementation of the program.According to the design modification of BZ25-1 oil group in the control system of FTE network project,the sea platform in control system( DCS) and emergency shutdown system( ESD) for the corresponding configuration and the picture changes,113 in the control server underlying database synchronization maintenance,WHPA/B/C/D/E/F and 194 A/B platform control system for FTE network transformation ESD network,system configuration services etc.
作者
张志华
ZHANG Zhihua(CNOOC(China) Ltd.. Tianjin Branch, Tianjin ,30045)
出处
《自动化与仪器仪表》
2018年第7期123-125,共3页
Automation & Instrumentation